2009 Fixit

Home Schedule Porch Bath Painting The Wall Windows

 

  

 

 

 

  

 

Project Task list:

Replace all windows with premium Andersen window inserts (except pantry and one tribute window in the dining room.)
Tear off the second floor deck on top of the front porch and restore the original roof and window configuration.  (Deck always leaked and rot/sagging resulted over 25 years)
Some roof repairs

Gut master bath and modernize featuring:

>remove tub, replace with shower

>heated floor

>twin sink and vanity

>heated towel rack

>New tile

>new toilet, location moved

>new lighting/ exhaust fan 

 

Sump pump in basement
Prep, scrape, and repaint house and garage.  Some new rain gutters on rear.

 

What's New

Get the gravely damaged wall replaced. Have contract with Pearce for rebuild.  Waiting for bricks.

Back to Top

Last updated: May 11, 2009.